Tender Overview
Request for proposals for an Energy Service Company (ESCO) to design, finance, build, own, operate, and maintain grid-tied solar PV and critical-load battery storage systems (BESS) at Maseno and Tumutumu hospitals under an Energy Services Agreement (ESA) model[cite: 343].
Tender Reference Number
RFP No. CHAK/ESCO/01/2026
Contract Duration
Co-development service contract runs from signature to 31 August 2027; the subsequent Energy Services Agreement (ESA) term is 10 to 15 years[cite: 346, 348].
Tender Security Details
A signed Bid-Securing Declaration is required in place of a tender security[cite: 360]. Performance security of 50% of the year-1 reference fee is required upon ESA execution[cite: 348].
Full Scope of Supply / Bill of Quantities (BOQ)
- Solar PV Systems: Grid-tied solar photovoltaic systems (indicative 15-300 kWp per facility) with no export to the grid[cite: 343, 344].
- Battery Energy Storage Systems (BESS): Critical-load battery backup with bidirectional inverters (UPS function) to protect essential clinical loads including vaccine cold chains, theatre lighting, patient monitoring, and water pumping[cite: 344].
- Co-Development Services: Baseline data collection, load profiling, system design, preparation of the ESA financial model, lender/DFI term sheet facilitation, and independent second-opinion review coordination[cite: 344, 345, 346].
- Operation & Maintenance (O&M): Comprehensive long-term maintenance, remote monitoring, performance guarantees, and NEMA-compliant end-of-life hardware management[cite: 346].
Key Requirements and Evaluation Criteria
Mandatory Requirements (Pass/Fail):
- Legal entity registered in Kenya or a Kenyan SPV with a named parent company[cite: 350].
- Valid KRA Tax Compliance Certificate and PIN certificate[cite: 350].
- Valid EPRA solar PV contractor license (class covering proposed system size)[cite: 350].
- Proven experience with at least three completed solar PV + BESS installations at commercial or institutional facilities in Kenya[cite: 350].
- Demonstrated financial capacity, audited accounts for the last three years, and commitment to fund 100% of hardware CAPEX[cite: 350].
- Commitment to a minimum of 99% critical-load uptime and ensuring a net savings of at least 30% of verified gross savings for each facility[cite: 350].
Evaluation Criteria: Evaluated using Quality and Cost Based Selection (QCBS) with a 70:30 technical-to-financial weighting, passing through mandatory screening, technical scoring (100 marks, 70 pass mark), and financial evaluation[cite: 349].


Reviews
There are no reviews yet.