Regulation Overview
Tender Reference Number: 652.236-70 (Additional Safety Measures, Oct 2017)[cite: 203]
Contract Duration: Not specified in the regulation clause.
Tender Security Details: Not specified.
Full Scope of Safety Requirements / Compliance
- High-Risk Activities Compliance: Adherence to the U.S. Army Corps of Engineers Safety and Health manual (EM 385-1-1) for activities including scaffolding, work at heights above 1.8 meters, trenching/excavation greater than 1 meter, earth-moving equipment, cranes and rigging, welding or hot work, demolition, temporary wiring/GFCI use, confined spaces, hazardous materials handling, and hazardous noise levels[cite: 203].
- Mishap Reporting & Records: Immediate reporting of all mishaps (injuries, illnesses, fires, explosions, property damage, or environmental contamination) to the COR and Contracting Officer, accompanied by accurate record maintenance[cite: 203, 204].
- Site Safety and Health Plan (SSHP): Submission of an SSHP at least 10 working days prior to commencing any site activity, detailing Activity Hazard Analyses (AHAs) for specific tasks[cite: 204].
- Subcontractor Flowdown: Mandatory inclusion of safety clauses and requirements across all subcontracts[cite: 204].
Key Requirements and Evaluation Criteria
- Safety Standards: Mandatory compliance with the latest edition of EM 385-1-1 or OSHA 29 CFR part 1910 or 1926[cite: 203].
- Competent Persons: Identification and submission of proof of competency/qualification for designated Competent/Qualified Persons prior to executing specialized work activities[cite: 204].
- COR Approval: Work is strictly prohibited from beginning until the written safety plan and AHAs have been reviewed and accepted by the COR[cite: 203, 204].