The licence that lets you install solar is not the licence that lets a factory generate it. This guide shows which one you need for your job, and the full stack of licences tenders actually check.
The five EPRA classes you will keep meeting in solar tenders.
Pick the option closest to your Tatu City or Ruiru job.
What does your job involve?
Every commercial installation needs the company’s EPRA Class C1, backed by a Class T3 technician in your employment. A technician’s own T2 is not enough: the licence you show must be the company’s.
Tenders often add an electrical contractor licence and the NCA category they set. See the licence stack below.
Tatu City is a Special Economic Zone, and its industrial park is turning rooftops into power stations. The developer has said it wants solar on all industrial park rooftops, up to 30 MW. Three projects show where the work is.
A 1 MW plant on its headquarters came first.
Commissioned a plant at its Tatu City facility, with approvals from both EPRA and Tatu Power.
Has announced a 1.3 MW rooftop plant on The Link.
These are two different licences held by two different people. Mixing them up is the most common mistake on solar tenders.
Held byThe company that designs and installs.
NeededEvery commercial job, any size.
ClassC1 (V1 and V2 for selling and importing).
Held byThe owner or operator of the plant.
NeededPower sold to others, or own-use above 1 MW.
ExemptOwn-premises, own-use below 1 MW.
A factory can need no generation licence for a 600 kW own-use roof and still require a licensed C1 contractor to build it. Tenders ask for the contractor licence.
A 2023 amendment proposed lowering the own-use threshold to 500 kW, so confirm EPRA’s current position.
Bidders often ask whether a technician’s T2 is enough. Procuring entities reply that installation needs the company’s C1, not the individual’s class. Many then add further layers.
Design and installation, backed by a T3 technician on staff.
Import and sale. Some tenders waive V1, so read the clause.
An A1 or A2 class is often requested alongside solar.
The category is set by the tender, and enforced.
Registration gaps knock out many otherwise strong bids. See the company registration mistakes that disqualify Kiambu County bids before you submit.
From EPRA’s June 2026 public notice. Applications go through the EPRA online licensing portal.
| Class | Covers | Application | Grant | Application + grant | Renewal |
|---|---|---|---|---|---|
| T1 | Technician, small systems | KSh 250 | KSh 1,000 | KSh 1,250 | KSh 500 |
| T2 | Technician, medium systems | KSh 500 | KSh 2,000 | KSh 2,500 | KSh 750 |
| T3 | Advanced technician, needed for C1 | KSh 750 | KSh 3,000 | KSh 3,750 | KSh 1,000 |
| C1 | Contractor: design and install | KSh 500 | KSh 1,000 | KSh 1,500 | KSh 1,000 |
| V1 | Vendor: design, sell, install | KSh 1,000 | KSh 2,500 | KSh 3,500 | KSh 1,000 |
| V2 | Manufacturer or importer | KSh 2,000 | KSh 5,000 | KSh 7,000 | KSh 2,000 |
Company licences are processed within 30 days of a complete application, technician licences within 60. Your T3’s licence can take twice as long as your company’s, so start with the person.
EPRA has published draft Petroleum (Local Content) Regulations, 2026 with a 30% share for youth, women and persons with disabilities. That is a petroleum-sector draft, not a solar rule, and it can change before gazettement.
The 30% you can rely on for public solar tenders today is AGPO. If you qualify, hold both an EPRA licence and an AGPO certificate. The Bidder’s Guide shows how.
EPRA has also floated draft solar regulations replacing T1 to T3 with four worker classes (SPW1 to SPW4). Until they are gazetted, the classes above apply. Confirm on the EPRA portal before filing.
Many tenders list it as a mandatory submission document, so you need it before you bid. Missing a mandatory document can end the bid at preliminary evaluation.
No. The T-class licenses a person. The company needs C1, or V1 where it also sells.
The owner generally needs no generation licence for own-use systems below 1 MW, but whoever builds it still needs the right contractor licence.
Browse open tenders or receive them with Daily Tender Alerts.
Bid-ready, faster. 30-day VIP Access gives you matching solar and energy tenders every morning, with full details and documents.
Get VIP accessWe prepare compliant tender documents, manage submissions and send you the tenders that match your licences.
Sources: EPRA public notice on solar licensing (reported by The Star, 22 June 2026); Energy (Solar Photovoltaic Systems) Regulations; EPRA draft Petroleum (Local Content) Regulations, 2026; Energy Act 2019 own-use provisions; published Kenyan tender clarifications; Standard and PV Tech coverage of Tatu City solar. This is general information, not legal advice. Confirm current classes and fees on the EPRA portal.