1Identity
Company name drift across documents
“Ltd” on one certificate, “Limited” on another. “&” in the KRA profile, “and” on the Certificate of Incorporation. Evaluators compare names line by line and read a mismatch as a different legal entity, not a typo.
The fixCopy the name letter for letter from your Certificate of Incorporation onto a one-line “name master” note. Check it against your KRA PIN certificate and TCC, NCA licence, AGPO certificate, CR12, and the name your bank or insurer prints on the tender security. If a government record is wrong, correct it before you bid. Our company registration and compliance service for Kamakis and Ruiru does this reconciliation.
2Validity
An expired Tax Compliance Certificate
A TCC is valid for 12 months and does not renew itself. Tenders typically require it to be valid on the closing date, so a certificate that lapsed days earlier counts as no certificate.
Renewal is also less forgiving now. KRA has added eTIMS/TIMS compliance to TCC applications for non-individual taxpayers, so unfiled returns or incomplete onboarding can stall it at the last minute.
The fixDiarise renewal 30 days before expiry, not on expiry. Clear any unfiled returns and unpaid balances, confirm eTIMS onboarding, then apply on iTax. Once downloaded, verify the certificate on KRA’s Certificate Checker so you know it authenticates when an evaluator tests it.
3Capacity
Bidding above your NCA category, or in the wrong works class
Each NCA category has a value ceiling, and the ceiling depends on the class of works: building, roads and civil, or specialist. A firm that is NCA 5 for building is not automatically NCA 5 for roads. A bid priced above your ceiling is exposed to disqualification however strong the technical proposal, and a lapsed annual practising licence undermines the category entirely.
| NCA category | Building works (up to KES) | Roads & other civil works (up to KES) |
| NCA 2 | 500 million | 750 million |
| NCA 3 | 300 million | 500 million |
| NCA 4 | 200 million | 300 million |
| NCA 5 | 100 million | 200 million |
| NCA 6 | 50 million | 100 million |
| NCA 7 | 20 million | 50 million |
| NCA 8 | 10 million | 20 million |
NCA 1 is unlimited in every class. Specialist contractors have their own, lower ceilings (NCA 8 is KES 5 million). Confirm current figures on the NCA local contractors page before you rely on them.
The fixBefore you buy a tender document, match three things: the works class, the estimated value, and the category on your current licence. Developments around Ruiru and Tatu City often mix building, civil and electrical packages, so check each package separately. Energy and solar contractors in that corridor should also read our guide to EPRA licensing for Ruiru and Tatu City.
4Validity
A missing, outdated or inconsistent CR12
A CR12 shows directors and shareholders as at the date it was issued. It has no expiry date, but tender documents set how recent it must be. An old copy that no longer matches your real shareholding is an easy rejection, especially when an AGPO certificate or Beneficial Ownership form sits beside it.
The fixPull a fresh CR12 through eCitizen at the start of every bid, not from a folder. If directors or shareholding have changed, confirm the change was actually filed with BRS before you quote the new structure anywhere. Check that the shareholding adds up to 100%.
5AGPO
AGPO ownership that does not hold up under verification
AGPO needs at least 70% ownership by the qualifying group (youth, women or persons with disabilities) and 100% qualifying leadership. You register under one category at a time.
Reviewers look past the share register to who really owns and controls the business. A nominee director, a “silent” relative holding a large block, or a declaration that disagrees with the CR12 puts the certificate, and every reserved tender behind it, at risk.
The fixSettle the ownership structure before you incorporate or restructure, not after you spot a reserved tender. Keep the CR12, IDs, NCPWD documents (where relevant) and your declaration telling one consistent story. Most guides put validity at two years and renewal needs a fresh TCC, so check the date printed on your certificate. Our AGPO Kenya guide walks through category choice and the portal steps.
6KRA
eTIMS registered on paper, not in practice
Being onboarded to eTIMS is only the entry ticket. Since 1 January 2026, KRA validates income and expenses in returns against eTIMS, withholding tax and customs data. If your invoicing does not run through eTIMS, your returns can fail validation, and a TCC depends on clean returns. KRA has also announced a Merchant Tax Compliance Certificate that looks further at electronic invoicing.
KRA’s FAQ says TCCs issued earlier remain valid for eTIMS-compliant taxpayers. So this is a trap for your next renewal, not necessarily your current certificate.
The fixIssue every sales invoice through eTIMS from day one, reconcile it against your books monthly, and treat any validation message on iTax as urgent. Exempt entities apply for the TCC through their Tax Service Office.
7County
No valid Kiambu County Single Business Permit
National registrations (NCA, AGPO, eTIMS) do not replace the county permit. Where a tender lists the Single Business Permit as mandatory, evaluators want the permit itself, not the receipt for an application.
Kiambu has moved to a unified permit that bundles charges such as health and fire inspection. The county has stated it runs for 12 months from the date it is obtained, so your renewal date is personal to you, not 31 December.
The fixRead the permit’s issue date, put the expiry in your calendar, and pay the full unified charge so the permit is actually released. If the tender is silent on whether a county permit is needed, ask for a written clarification before the deadline.
8Newer trap
A Beneficial Ownership declaration that contradicts the BRS record
Companies must keep a register of beneficial owners (people who hold at least 10% of shares or voting rights, or otherwise control the company) and lodge it with the Registrar. Changes are to be filed within 14 days.
Public tender documents now routinely carry their own Beneficial Ownership Disclosure Form. If what you sign in the bid differs from what BRS holds, you have a false-declaration problem on top of a document problem, and giving false information is a standard ground for automatic disqualification.
The fixUpdate the BRS beneficial ownership record first, then complete the tender form from that record. Never fill the form from memory.
9Newer trap
A company in poor standing: annual returns not filed
The Registrar has been publishing notices in 2026 to remove non-filing companies from the register. A company under a show-cause notice, or struck off, cannot safely contract, and a bid built on it falls with it. Many owners only find out when they pull a CR12 and something looks wrong.
The fixLog in to your company on the BRS platform via eCitizen every quarter and confirm its status and filings. File overdue annual returns before you start preparing bids, not after.
10Submission
Paperwork and portal slips: signatures, tender security and e-GP
Unsigned or unstamped forms of tender, a single missed BOQ page, a tender security in the wrong format or from an issuer the tender does not accept, or a portal profile that does not mirror your documents. These are not registration errors in the strict sense, but they are decided at the same pass-or-fail stage.
Many public entities have moved to the Government e-Procurement system (e-GP), and the Treasury directed counties to complete its integration with IFMIS by the end of September 2026. Check the invitation to see which portal the tender uses.
The fixBuild a signing checklist covering every page the tender requires to be signed or stamped, copy the tender security template exactly, and register on the portal well before the deadline. Our tender preparation service runs this check for you.