Home / Blog / EPRA licensing

EPRA licensing guide Updated 13 Nov 2026 6 min read

Which EPRA Licence Do You Need to Bid for Solar Work in Ruiru and Tatu City?

The licence that lets you install solar is not the licence that lets a factory generate it. This guide shows which one you need for your job, and the full stack of licences tenders actually check.

C1Design and install
V1Sell systems
V2Import or manufacture
T3Technician behind C1
Gen.Plant owner: power sold, or own-use above 1 MW

The five EPRA classes you will keep meeting in solar tenders.

30 daysProcessing for contractor, vendor and manufacturer licences.
60 daysProcessing for technician licences (T1 to T3).
KSh 1,500C1 contractor: application plus grant.
1 MWOwn-use generation exemption ceiling.

The short answer

  • Install for clients: EPRA Class C1, with a Class T3 technician in your employment.
  • Import panels: add V2. Sell systems: add V1.
  • Generate power: a generation licence, held by the plant owner, not the installer.

Find your licence in ten seconds

Pick the option closest to your Tatu City or Ruiru job.

What does your job involve?

You need
C1T3 technician on staff

Every commercial installation needs the company’s EPRA Class C1, backed by a Class T3 technician in your employment. A technician’s own T2 is not enough: the licence you show must be the company’s.

Tenders often add an electrical contractor licence and the NCA category they set. See the licence stack below.

Why Tatu City changes the picture

Tatu City is a Special Economic Zone, and its industrial park is turning rooftops into power stations. The developer has said it wants solar on all industrial park rooftops, up to 30 MW. Three projects show where the work is.

Dormans Coffee

A 1 MW plant on its headquarters came first.

KWAL

Commissioned a plant at its Tatu City facility, with approvals from both EPRA and Tatu Power.

Hounen

Has announced a 1.3 MW rooftop plant on The Link.

Before you price: on a Tatu City job, EPRA is not the only sign-off. The estate’s power company is part of the approval, so involve them early.

Contractor licence vs generation licence

These are two different licences held by two different people. Mixing them up is the most common mistake on solar tenders.

Contractor licence

Held byThe company that designs and installs.

NeededEvery commercial job, any size.

ClassC1 (V1 and V2 for selling and importing).

Generation licence

Held byThe owner or operator of the plant.

NeededPower sold to others, or own-use above 1 MW.

ExemptOwn-premises, own-use below 1 MW.

The trap

A factory can need no generation licence for a 600 kW own-use roof and still require a licensed C1 contractor to build it. Tenders ask for the contractor licence.

A 2023 amendment proposed lowering the own-use threshold to 500 kW, so confirm EPRA’s current position.

The licence stack solar tenders check

Bidders often ask whether a technician’s T2 is enough. Procuring entities reply that installation needs the company’s C1, not the individual’s class. Many then add further layers.

EPRA licences

EPRA Class C1 contractor licence

Design and installation, backed by a T3 technician on staff.

EPRA V2 and/or V1

Import and sale. Some tenders waive V1, so read the clause.

EPRA electrical contractor licence

An A1 or A2 class is often requested alongside solar.

Other documents tenders ask for

NCA registration

The category is set by the tender, and enforced.

KRA tax compliance certificate

Guide for Ruiru and Kamakis bidders

AGPO certificate, if you qualify

How AGPO works

Registration gaps knock out many otherwise strong bids. See the company registration mistakes that disqualify Kiambu County bids before you submit.

2026 fees and processing times

From EPRA’s June 2026 public notice. Applications go through the EPRA online licensing portal.

ClassCoversApplicationGrantApplication + grantRenewal
T1Technician, small systemsKSh 250KSh 1,000KSh 1,250KSh 500
T2Technician, medium systemsKSh 500KSh 2,000KSh 2,500KSh 750
T3Advanced technician, needed for C1KSh 750KSh 3,000KSh 3,750KSh 1,000
C1Contractor: design and installKSh 500KSh 1,000KSh 1,500KSh 1,000
V1Vendor: design, sell, installKSh 1,000KSh 2,500KSh 3,500KSh 1,000
V2Manufacturer or importerKSh 2,000KSh 5,000KSh 7,000KSh 2,000

Company licences are processed within 30 days of a complete application, technician licences within 60. Your T3’s licence can take twice as long as your company’s, so start with the person.

How to get licensed before the tender opens

  1. Secure your T3. A director who qualifies, or a hire. Their licence must be valid before C1 is granted.
  2. Clean up company records. CR12, incorporation certificate, KRA PIN and tax compliance certificate. We handle this for Kamakis and Ruiru companies.
  3. Apply on the EPRA portal. Upload every listed document. Missing attachments cause most delays.
  4. Add the layers your tender needs. V2, an electrical contractor licence, the right NCA category.
  5. Diarise renewals. A lapsed licence on opening day can end your bid.

Local content and AGPO: law versus draft

Draft, not law

EPRA has published draft Petroleum (Local Content) Regulations, 2026 with a 30% share for youth, women and persons with disabilities. That is a petroleum-sector draft, not a solar rule, and it can change before gazettement.

What you can rely on today

The 30% you can rely on for public solar tenders today is AGPO. If you qualify, hold both an EPRA licence and an AGPO certificate. The Bidder’s Guide shows how.

The rules are moving

EPRA has also floated draft solar regulations replacing T1 to T3 with four worker classes (SPW1 to SPW4). Until they are gazetted, the classes above apply. Confirm on the EPRA portal before filing.

Common questions

Do I need an EPRA licence to bid, or only to start work?

Many tenders list it as a mandatory submission document, so you need it before you bid. Missing a mandatory document can end the bid at preliminary evaluation.

Is a T2 licence enough to install solar for a client?

No. The T-class licenses a person. The company needs C1, or V1 where it also sells.

Can I install solar on my own factory without a licence?

The owner generally needs no generation licence for own-use systems below 1 MW, but whoever builds it still needs the right contractor licence.

Where do I find solar tenders in Ruiru and Kiambu?

Browse open tenders or receive them with Daily Tender Alerts.

Bid-ready, faster. 30-day VIP Access gives you matching solar and energy tenders every morning, with full details and documents.

Get VIP access

Licensed and ready to bid?

We prepare compliant tender documents, manage submissions and send you the tenders that match your licences.

Keep going

Sources: EPRA public notice on solar licensing (reported by The Star, 22 June 2026); Energy (Solar Photovoltaic Systems) Regulations; EPRA draft Petroleum (Local Content) Regulations, 2026; Energy Act 2019 own-use provisions; published Kenyan tender clarifications; Standard and PV Tech coverage of Tatu City solar. This is general information, not legal advice. Confirm current classes and fees on the EPRA portal.